settleinrome.blogspot.com
Settle in Rome - A Home by Ryan Homes: 23 March 2015 - Day 97 - Private Inspection
http://settleinrome.blogspot.com/2015/03/23-march-2015-day-97-private-inspection.html
Settle in Rome - A Home by Ryan Homes. Tuesday, March 24, 2015. 23 March 2015 - Day 97 - Private Inspection. So we had a private inspector come inspect the house today to make sure there wasn't any major issues before we closed on Thursday. A couple of things the inspector noted was a lightswitch that would not turn off all the way, and blown insulation in the A/C / Furnce drain pan, which could cause a clog. Other than that below are a handful of things I came across:. Pin holes in the bathroom grout.
settleinrome.blogspot.com
Settle in Rome - A Home by Ryan Homes: 16 March 2015 - Day 90 - Driveway Prep & wifey gets in a box
http://settleinrome.blogspot.com/2015/03/16-march-2015-day-90-driveway-prep.html
Settle in Rome - A Home by Ryan Homes. Tuesday, March 17, 2015. 16 March 2015 - Day 90 - Driveway Prep and wifey gets in a box. Looks like they prepped the driveway. Wifey decided to get up all in that hoe. ;-) see what I did there. Lol. Not the brightest people in the world. I guess one on the socket wires got loose so the drywall guys just poked a hole through the sheetrock and let the wire dangle. Looks like it got corrected. Shower prepped for tile. Tub is also prepped for tile. Wifey gets in a box.
settleinrome.blogspot.com
Settle in Rome - A Home by Ryan Homes: Selections
http://settleinrome.blogspot.com/p/selections.html
Settle in Rome - A Home by Ryan Homes. Elevation E - All Vinyl - Brick to Grade 4-sides - Caramel Brick. Spanish Olive Vinyl / White Trim. Natural Almond Shake Siding. Tricorn Black Door / Shutters. Vaulted Ceiling in Master Bedroom. Ceiling Fan Rough-In all Rooms except for Dining/Living Room. Tiled / Upgraded Shower / Tub in Master. Gourmet Kitchen Island Upgrade. 42" Kitchen Cabinet Upgrade - Rushmore Hazelnut Glaze. Family Room / Study - Graystone Seattle Mist Carpet. Subscribe to: Posts (Atom).
settleinrome.blogspot.com
Settle in Rome - A Home by Ryan Homes: Progression Pictures
http://settleinrome.blogspot.com/p/progression-pictures.html
Settle in Rome - A Home by Ryan Homes. Unfortunately I wasn't organized from the beginning so I do not have the same angle of the build throughout the construction period. Day 70 - Morning. Day 70 - Evening. Subscribe to: Posts (Atom). Our Journey to Naples. Special Thanks and Pics. Our Naples adventure in Shorewood, Illinois! Baird Bliss: Building our Ryan Homes Dunkirk. The NIGHTMARE that is General Electric. Building Our New Ravenna Ryan Home. Finished House and Ready to Sell!
settleinrome.blogspot.com
Settle in Rome - A Home by Ryan Homes: 14 March 2015 - Day 88 - A broom and some chit chat
http://settleinrome.blogspot.com/2015/03/14-march-2015-day-88-broom-and-some.html
Settle in Rome - A Home by Ryan Homes. Saturday, March 14, 2015. 14 March 2015 - Day 88 - A broom and some chit chat. Another day shot due to the heavy rains we had today. We ran over to Lowes this morning to inquire about blinds, and schedule delivery of the Washer/Dryer and Fridge for the day after closing. We've been postponing delivery since we purchased them on Black Friday. BTW: Lowes is offering 25% off on certain custom blinds till 25 March. Finished granite and a broom awaiting to meet the floor.
myryanhomesmilan.dustinmoses.com
Ryan Homes Milan: New Home Construction Experience: March 2016
http://myryanhomesmilan.dustinmoses.com/2016_03_01_archive.html
Ryan Homes Milan: New Home Construction Experience. Friday, March 25, 2016. We've got Counter-tops and Appliances! The one issue we found out is that the counter-top installers cracked the piece of granite that is supposed to connect the breakfast bar to the counter-top. basically a granite back-splash that goes behind the sink. Was told they had to order a new piece and it would be installed soon. We're a week and a half from closing! One coat of paint. Here's the ONE picture from today:. This past week...
myryanhomesmilan.dustinmoses.com
Ryan Homes Milan: New Home Construction Experience: February 2016
http://myryanhomesmilan.dustinmoses.com/2016_02_01_archive.html
Ryan Homes Milan: New Home Construction Experience. Sunday, February 28, 2016. Framing Complete - Moving Along. Framing Done. on to Plumbing and HVAC. This past week was, apparently, a busy one! Here's a run down of our progress at this point:. Want to also give credit to my PM's (we now have two), Andrew and Bryan, and the trade crews for doing an exceptional job with the framing, plumbing, and HVAC. I was pretty impressed and everything I asked for was done! And now for the onslaught of photos! Furnace...
ourveniceinpa.blogspot.com
Our Venice in PA: January 2012
http://ourveniceinpa.blogspot.com/2012_01_01_archive.html
Our Venice in PA. Sunday, January 22, 2012. We have a foundation! We were so surprised to pull into our future cul-de-sac yesterday and see the foundation rising above our lot at the end of the street! Our PM told us that, weather permitting, they would pour it Thursday and Friday, but I just figured that it was going to be too cold for the cement to cure. It really feels like this is moving so fast - much faster than I ever imagined! Saturday, January 14, 2012. We had two exciting things happen yesterday.
ourveniceinpa.blogspot.com
Our Venice in PA: March 2012
http://ourveniceinpa.blogspot.com/2012_03_01_archive.html
Our Venice in PA. Saturday, March 10, 2012. I LOVE LOVE LOVE my granite! We found out last week that our PM, Matt, was no longer going to be with us due to the heavy volume of houses under construction in our neighborhood. Matt himself was responsible to a whopping 17 houses! Sunday, March 4, 2012. We made it up to our new house this weekend and this is what greeted us, majestically sitting atop its little hill at the end of the cul-de-sac:. On another note, our cabinets are in:. View my complete profile.